Great  Photos

of past experience and work

I'm a paragraph. Click here to add your own text and edit me. I’m a great place for you to tell a story and let your users know a little more about you.

Ripian Revegetation Efforts
Ripian Revegetation Efforts

Coordinating monitoring requirements for Stream Restoration Projects; restoring native vegetation.

press to zoom
Turbid swale with controls
Turbid swale with controls

Swale with turbid water (< 250 NTU) with seemingly adequate erosion and sediment control.

press to zoom
CDS unit maintenance
CDS unit maintenance

Post-construction and operational BMP inspection. CDS unit with floatables.

press to zoom
Cement near DI
Cement near DI

Dry cement dumped near drain inlet produces future water quality exceedance. Should be cleaned up immediately. Common occurrence at many supply stores.

press to zoom
BFM and DI protection
BFM and DI protection

Drain inlets with robust barriers and bonded fiber matrix application on slopes. Efforts assist in reducing erosion and turbid discharges while vegetation is established.

press to zoom
Innovative sampling
Innovative sampling

Sampling approaches change as construction progresses. Collection system converges to a Stormceptor unit - as the convergent sampling point.

press to zoom
Field DI sampling point
Field DI sampling point

Questionable protection of drain inlet as area re-vegetation is in progress. Approach may be to cover inlet with filter fabric and divert or pond runoff - at least temporarily. Monitor for fertilizer application.

press to zoom
IMG_6902.JPG
IMG_6902.JPG
press to zoom
flooded Chollas.JPG
flooded Chollas.JPG
press to zoom